Project Description for 535 CT Ave.
TitleDescription
Roofing Contractors Accepted from the Following Areas Contractor to be Selected Soon After Bid Review. This is a Fall 2006 Project - contractor must be available to begin ASAP (weather permitting)
Total Square Footage 50 Miles from Project
Insurance Requirements Please see minimum insurance requirements by clicking on link above.
Performance Bond 10 year full system - Labor and Material, No Dollar Limit Warranty.
Asbestos May be required. Contractor must be able to obtain a performance bond for this project. The cost for the performance bond will be a line item on the bid form for the Building Owner to consider.
Type of Specification Proprietary Specification. Base Bid will be specified roof System from GAF, Johns Manville, Sarnifil or Carlisle- Syntec. GAF, Johns Manville, Sarnifil or Carlisle-Syntec certified contractors only.
Job Start Recovery specification for new Fully adhered TPO or PVC roof membrane over one (1) inch polyisocyanurate insulation that will be mechanically attached thru the existing BUR membrane (Remove Gravel).
Performance Bond Lightweight Concrete over EPS over Vented Steel Deck
Location, City & State No - Recovery Specification.
Warranty Built Up roof with gravel that is directly over the lightweight concrete.
Anticipated Project Schedule Norwalk, CT
Existing Roof System Approximately 27,000 square feet